CARE Deliverables |
||
Activity |
Deliverable N° |
Deliverable Name |
Deliverable Type |
Workpackage/Task N° |
Delivered by Contractor (s) |
Planned (in months) |
Achieved (in months) |
ELAN |
1 |
ELAN web site |
All WPs |
CNRS-Orsay |
4 |
4 |
|
ELAN |
2 |
Beam Dynamics code repository site
functional |
WP3 |
CERN |
12 |
12 |
|
ELAN |
3 |
Instrumentation web site |
WP4 |
STFC, UMA |
6 |
21 |
|
ELAN |
4 |
Instrumentation data base |
WP4 |
STFC, UMA |
12 |
23 |
|
BENE |
5 |
BENE web site |
All WPs |
INFN-Na |
4 |
4 |
|
BENE |
6 |
Annual report of the BENE network |
All WPs |
INFN-Na |
12 |
12 |
|
BENE |
7 |
Proposal for FP6 Design Study of a
new neutrino facility |
Report |
All WPs |
INFN-Na |
12 |
delayed to FP7 |
BENE |
8 |
Proceedings of Multi-MW workshop |
All WPs |
INFN-Na |
12 |
14 |
|
BENE |
9 |
BENE Physics web site |
WP1 |
INFN-Pa, CERN |
3 |
3 |
|
HHH |
10 |
HHH web site |
All WPs |
CERN |
12 |
9 |
|
HHH |
11 |
APD web site |
WP3 |
CERN |
6 |
9 |
|
SRF |
12 |
Final report on reliability issues |
WP2 |
DESY |
9 |
30 |
|
SRF |
13 |
EP on samples: best EP parameters |
WP5 |
CEA |
12 |
26 |
|
NED |
14 |
Final report on wire and cable
specifications |
WP3 |
CERN |
6 |
6 |
|
NED |
15 |
Design report on 15 T dipole
magnet |
WP3 |
CERN |
12 |
13 |
Activity |
Deliverable N° |
Deliverable Name |
Deliverable Type |
Workpackage/Task N° |
Delivered by Contractor (s) |
Planned (in months) |
Achieved (in months) |
ELAN |
1 |
Work plan and documentation data
base |
WP1 |
CERN |
24 |
22 |
|
ELAN |
2 |
Data base on SRF documents |
WP2 |
DESY |
24 |
24 |
|
BENE |
3 |
18-month interim report |
All WPs |
INFN-Na |
23 |
23 |
|
BENE |
4 |
Annual report of the BENE network |
All WPs |
INFN-Na |
24 |
24 |
|
BENE |
5 |
Proceedings of NuFact’05 workshop |
All WPs |
INFN-Na |
24 |
30 |
|
BENE |
6 |
Launch of scoping study of a new
neutrino facility |
All WPs |
INFN-Na |
18 |
18 |
|
HHH |
7 |
Beam Dynamics code repository |
WP3 |
CERN |
24 |
18 |
|
SRF |
8 |
EP on multi-cells: parameters
fixed |
WP5 |
DESY |
13 |
37 |
|
SRF |
9 |
Automated EP is defined |
WP5 |
INFN-Legnaro |
21 |
37 |
|
SRF |
10 |
Dry ice cleaning: parameters fixed |
WP5 |
DESY |
18 |
37 |
|
SRF |
11 |
CEA tuner: start of integrated
experiments |
WP8 |
CEA |
15 |
24 |
|
SRF |
12 |
Report on IN2P3 tuner activities |
WP8 |
CNRS-Orsay |
24 |
39 |
|
SRF |
13 |
Report on data management
developments |
WP9 |
DESY |
21 |
24 |
|
SRF |
14 |
Report on RF gun control tests |
WP9 |
DESY |
23 |
37 |
|
PHIN |
15 |
High efficiency photocathode
comparison |
WP2 |
FZR |
24 |
24 |
|
PHIN |
16 |
High power laser oscillator |
WP3 |
STFC-RAL |
13 |
13 |
|
PHIN |
17 |
Amplifier construction |
WP3 |
CERN, INFN |
19 |
54 |
|
PHIN |
18 |
Oscillator + amplifier test |
WP3 |
STFC-RAL |
23 |
30 |
|
PHIN |
19 |
Pulse shaping system: phase mask
acquisition and test |
WP3 |
INFN-Milano |
16 |
23 |
|
PHIN |
20 |
Pulse shaping system: Dazzler
acquisition and test |
WP3 |
INFN-LNF |
17 |
41 |
|
PHIN |
21 |
Pulse shaping comparison |
WP3 |
INFN-LNF, INFN-Milano |
22 |
47 |
|
PHIN |
22 |
UV harmonic generator test |
WP3 |
CERN, CEA |
16 |
54 |
|
PHIN |
23 |
Laser RF feedback development |
WP3 |
CERN |
21 |
59 |
|
PHIN |
24 |
Two 3 GHz RF guns construction |
WP4 |
CNRS-Orsay |
18 |
54 |
|
PHIN |
25 |
1-50 MeV spectrometer construction |
WP4 |
CNRS-LOA |
24 |
36 |
|
HIPPI |
26 |
Halo measurement device design and
construction |
WP5 |
CERN |
18 |
24 |
|
NED |
27 |
Commissioning of heat transfer
facility |
WP2 |
CEA, WUT |
16 |
35 |
|
NED |
28 |
Final report on Quench Protection |
WP2 |
INFN-Milano |
18 |
23 |
|
NED |
29 |
Report on conventional insulation |
WP4 |
STFC-RAL |
24 |
40 |
|
NED |
30 |
Report on innovative insulation |
WP4 |
CEA |
18 |
48 |
Activity |
Deliverable N° |
Deliverable Name |
Deliverable Type |
Workpackage/Task N° |
Delivered by Contractor (s) |
Planned (in months) |
Achieved (in months) |
ELAN |
1 |
Data base on diagnostics
performance |
WP4 |
STFC, UMA |
36 |
36 |
|
BENE |
2 |
All WPs |
INFN-Na |
36 |
38 |
||
BENE |
3 |
Proposal for design studies and
R&D |
All WPs |
INFN-Na, CCLRC |
36 |
31 |
|
BENE |
4 |
Summary of NuFact’06 workshop Strategy document |
All WPs |
INFN-Na |
36 |
32 |
|
HHH |
5 |
Data base on SC magnets and cables |
WP1 |
CERN |
36 |
48 |
|
SRF |
6 |
Evaluation of spinning parameters |
WP3 |
29 |
37 |
||
SRF |
7 |
1-cell spinning parameters defined |
WP3 |
INFN-Legnaro |
36 |
57 |
|
SRF |
8 |
Report on new LLRF hardware
components |
WP9 |
DESY |
26 |
37 |
|
SRF |
9 |
New BPM ready for installation |
WP11 |
CEA |
25 |
34 |
|
SRF |
10 |
Evaluation of HOM-BPM operation |
WP11 |
CEA |
36 |
37 |
|
PHIN |
11 |
Photocathode ready for 3 GHz RF
guns |
WP2 |
CERN |
25 |
41 |
|
PHIN |
12 |
UV generation and feedback:
overall system assembly and tests |
WP3 |
CERN |
30 |
58 |
|
PHIN |
13 |
SC RF gun realisation |
WP4 |
FZR |
26 |
36 |
|
PHIN |
14 |
SC RF gun test |
WP4 |
FZR |
36 |
part 1: 39 final : 59 |
|
PHIN |
15 |
CTF3 3 GHz RF gun test at CERN |
WP4 |
CNRS-Orsay, CERN |
33 |
60 |
|
HIPPI |
16 |
H-mode
DTL prototype ready |
WP2 |
IAP-FU |
36 |
54 |
|
HIPPI |
17 |
CCDTL prototype tested |
WP2 |
CERN |
36 |
47 |
|
HIPPI |
18 |
Elliptical cavities: cavity B
ready |
WP3 |
CEA |
30 |
41 |
|
HIPPI |
19 |
Chopping structure A: prototype
ready |
WP4 |
CERN |
32 |
36 |
|
HIPPI |
20 |
Beam Dynamics: simulations and
experiments at UNILAC |
WP5 |
GSI |
36 |
46 |
|
HIPPI |
21 |
Profile measurements by
fluorescence |
WP5 |
GSI |
31 |
38 |
|
HIPPI |
22 |
Non interceptive bunch measurement |
WP5 |
GSI |
36 |
42 |
|
HIPPI |
23 |
Collimators design |
WP5 |
CERN |
36 |
30 |
|
NED |
24 |
Final Report on Heat Transfer
Measurements |
WP2 |
CEA |
36 |
47 |
|
NED |
25 |
Final wire production |
WP3 |
CERN |
30 |
60 |
|
NED |
26 |
Final report on wire characterization |
WP3 |
CERN |
30 |
60 |
|
NED |
27 |
Final cable production |
WP3 |
CERN |
36 |
60 |
|
NED |
28 |
Final report on cable performances |
WP3 |
CERN |
36 |
60 |
Activity |
Deliverable N° |
Deliverable Name |
Deliverable Type |
Workpackage/Task N° |
Delivered by Contractor (s) |
Planned (in months) |
Achieved (in months) |
ELAN |
1 |
Data base on laser plasma
acceleration |
Data base |
WP5 |
CRNS-LPGP |
48 |
cancelled |
BENE |
2 |
Annual report of the BENE network |
All WPs |
INFN-Na |
48 |
48 |
|
BENE |
3 |
Proposal for design studies and
R&D |
All WPs |
INFN-Na |
48 |
48 |
|
BENE |
4 |
Proceedings of NuFact’07 workshop |
All WPs |
INFN-Na |
48 |
60 |
|
SRF |
5 |
Fabrication of new cavity with
improved components |
WP2 |
INFN |
47 |
59 |
|
SRF |
6 |
EB Welding of prototype components |
WP2 |
DESY |
48 |
57 |
|
SRF |
7 |
Fabrication Multi-cell cavities by
spinning |
WP3 |
INFN-Legnaro |
48 |
60 |
|
SRF |
8 |
Fabrication of hydroformed 9-cell
cavities |
WP3 |
DESY |
47 |
60 |
|
SRF |
9 |
First multicell coating with
linear-arc cathode |
WP4 |
IPJ |
48 |
60 |
|
SRF |
10 |
First multicell coating with
planar-arc cathode |
WP4 |
INFN-Roma2 |
41 |
60 |
|
SRF |
11 |
Report on quality of HTc
superconducting properties |
WP4 |
INFN-Roma2 |
48 |
59 |
|
SRF |
12 |
EP on single cells: parameters
fixed |
WP5 |
CEA |
48 |
57 |
|
SRF |
13 |
Evaluate oxipolishing experiments |
WP5 |
DESY |
40 |
60 |
|
SRF |
14 |
Final report on industrial
electropolishing |
WP5 |
DESY |
48 |
59 |
|
SRF |
15 |
Automated EP: Conclude on best
electrolyte |
WP5 |
INFN-Legnaro |
44 |
59 |
|
SRF |
16 |
VT cleaning of 9-cell cavities:
evaluation of experimental results |
WP5 |
DESY |
48 |
60 |
|
SRF |
17 |
Dry ice cleaning of horizontal
9-cell cavities: evaluation of experimental results |
WP5 |
DESY |
48 |
60 |
|
SRF |
18 |
Final report on SQUID scanning |
WP6 |
DESY |
48 |
57 |
|
SRF |
19 |
Conclude on comparison of SQUID
scanner vs. flux gate detector |
WP6 |
INFN-Legnaro |
48 |
59 |
|
SRF |
20 |
DC field emission: evaluation of
scanning results |
WP6 |
DESY |
48 |
51 |
|
SRF |
21 |
DC field emission: evaluate strong
emitter investigations |
WP6 |
DESY |
48 |
51 |
|
SRF |
22 |
Prototype couplers: final report
on conditioning |
WP7 |
CNRS-Orsay |
47 |
59 |
|
SRF |
23 |
Evaluation of INFN tuner operation |
WP8 |
INFN-Mi |
48 |
51 |
|
SRF |
24 |
Cryostat integration tests: final
evaluation |
WP10 |
CEA |
46 |
60 |
|
SRF |
25 |
Evaluation of BPM operation |
WP11 |
CEA |
48 |
48 |
|
SRF |
26 |
Evaluation of beam emittance
monitor operation |
WP11 |
INFN-Ro |
48 |
59 |
|
PHIN |
27 |
Superconducting cavity
photocathode tests |
WP2 |
FZR |
37 |
59 |
|
PHIN |
28 |
Final report on 100 MeV laser
driven plasma source R&D |
WP2 |
CNRS-LOA |
48 |
47 |
|
PHIN |
29 |
NEPAL 3 GHz RF gun test at Orsay |
WP4 |
CNRS-Orsay |
37 |
59 |
|
PHIN |
30 |
50 MeV (low energy) spectrometer
test |
WP4 |
CNRS-LOA |
42 |
36 |
|
PHIN |
31 |
1 GeV spectrometer development |
WP4 |
CNRS-LOA |
48 |
47 |
|
HIPPI |
32 |
Drift Tube Linac: development of
critical components |
WP2 |
CNRS-LPSC |
37 |
46 |
|
HIPPI |
33 |
Side Couple Linac: RF cold model
prototype test |
WP2 |
CNRS-LPSC, CERN |
48 |
52 |
|
HIPPI |
34 |
Elliptical cavities: test stand
ready |
WP3 |
CEA |
39 |
47 |
|
HIPPI |
35 |
Spoke cavities: prototype ready |
WP3 |
FZJ, CNRS-Orsay |
46 |
54 |
|
HIPPI |
36 |
Chopper structure A: prototype
testing (w/o and with beam) |
WP4 |
CERN |
44 |
57 |
|
HIPPI |
37 |
Chopper line: Beam line assembly
and measurements |
WP4 |
CERN |
48 |
60 |
|
HIPPI |
38 |
Chopper structure B: prototype
ready |
WP4 |
STFC-RAL |
42 |
54 |
|
HIPPI |
39 |
Diagnostics and collimation: online
transmission control |
WP5 |
GSI |
46 |
52 |
|
HIPPI |
40 |
Diagnostics and collimation: beam
profile monitor for high intensity |
WP5 |
FZJ |
42 |
46 |
Activity |
Deliverable N° |
Deliverable Name |
Deliverable Type |
Workpackage/Task N° |
Delivered by Contractor (s) |
Planned (in months) |
Achieved (in months) |
ELAN |
1 |
Final report of the ELAN network |
All WPs |
CNRS-Orsay |
60 |
60 |
|
BENE |
2 |
Final report of the BENE network |
All WPs |
INFN-Na |
60 |
60 |
|
BENE |
3 |
Proposal
for design studies and R&D |
All WPs |
INFN-Na |
60 |
60 |
|
BENE |
4 |
Proceedings of NuFact’08 workshop |
All WPs |
INFN-Na |
60 |
60 |
|
HHH |
5 |
Final report of the HHH network |
All WPs |
CERN |
60 |
60 |
|
HIPPI |
6 |
Drift Tube Linac: Optimised design |
WP2 |
CNRS-LPSC, CEA, CERN |
60 |
60 |
|
HIPPI |
7 |
H-mode Drift Tube Linac: design
finished |
WP2 |
IAP-FU |
60 |
60 |
|
HIPPI |
8 |
Cell Coupled Drift Tube Linac:
design finished |
WP2 |
CERN |
54 |
56 |
|
HIPPI |
9 |
Comparative assessment of Normal
Conducting structures |
WP2 |
CNRS-LPSC, CEA, CERN, IAP-FU |
60 |
60 |
|
HIPPI |
10 |
Elliptical cavities: high power
pulsed tests cavity A and B |
WP3 |
CEA, INFN-Mi |
60 |
60 |
|
HIPPI |
11 |
Spoke cavities: testing of prototype |
WP3 |
FZJ, CNRS-Orsay |
60 |
60 |
|
HIPPI |
12 |
CH resonator: measurements |
WP3 |
IAP-FU |
60 |
60 |
|
HIPPI |
13 |
Comparative assessment of
superconducting structures |
WP3 |
CEA, INFN-Mi, FZJ, IAP-FU,
CNRS-Orsay |
60 |
60 |
|
HIPPI |
14 |
Chopper structure B: prototype
testing |
WP4 |
STFC-RAL |
54 |
54 |
|
HIPPI |
15 |
Comparative assessment of chopper
designs |
WP4 |
CERN, STFC-RAL |
58 |
60 |
|
HIPPI |
16 |
Beam Dynamics: code benchmarking |
WP5 |
GSI et al. |
58 |
58 |
|
HIPPI |
17 |
Simulations and experiment at CERN |
WP5 |
CERN |
60 |
60 |
|
HIPPI |
18 |
Comparative assessment of dynamics
and measurements |
WP5 |
GSI et al. |
60 |
60 |